Claims management in Fresh Fruit Trade

WhatsApp Image 2017-04-11 at 17.12.19

When a problem at the arrival of the goods to the port occurs, their are several steps to follow.
First of all, the shipper must check if the temperature registered in the thermographs is corresponding with the temperature written in the BL. If the temperature appears stable, he also needs to check the percentage of ventilation which must correspond with the parameter written on the BL. Sigue leyendo